R&R DEMOLITION SIMULATION

PRE-BID DEMOLITION INTELLIGENCE · BRIDGE REMOVE-AND-REPLACE

The demolition line is where
bridge bids leak.


On bridge remove-and-replace work, removal of the existing structure is ~1.5% of the winning bid — and the item with the highest price disagreement between bidders of anything in the proposal. Everyone prices the replacement well. Almost nobody prices the removal from evidence. We do.

REQUEST A PROSPECTUSOPEN THE LIVE 3D DEMO ↗
20.4M
public bid rows harvested
15
state DOT archives, 1993–2026
$5.38B
awarded demolition volume observed
1.45–2.78×
bidder disagreement on demo vs all other items

measured across 13 states with itemized records; dispersion = cross-bidder CV on demolition items relative to all other items in the same lettings

What we hand you before the letting

A fixed-fee pre-bid demolition prospectus for a specific contract on your letting list, delivered at least two weeks before bid day.

Price band from actualsMEASURED
What this structure class has really awarded for — structure-resolved records joining material, dimensions, and condition to realized prices — plus how the local field prices it and where winners have been carrying it.
Method check, simulatedPHYSICS
We rebuild the structure member-by-member from public records and simulate the removal: pick counts and weights, crane class, shifts, truckloads, stability at every intermediate state.
Constraint calendarWINDOWS
Environmental windows, in-water limits, detour interactions — the schedule traps that turn a cheap demo into an expensive one.
Staging intelligenceGEO
Ranked laydown and access options from parcel, floodplain, and wetland data — plus where the money hides in the temporary works around the wrecking line.

Proof, not promises

BAND PUBLISHED BEFORE BID DAY

We run this on real lettings before they bid. Current demonstration: NCDOT contract C204877 — SR 2125 over Floyds Creek, Rutherford County — letting August 18, 2026.

FLOYDS CREEK · REMOVAL LEDGERFROM PUBLIC RECORDS
Structure reconstructed93 members · 340.7 t
Routine pick (PSC channel unit)4.54 t — one-crane pick
Crane shifts, superstructure5–8
Debris haul~23 loads @ 15 t
Governing windowbat moratorium 4/15–10/15
Method verdictsaw-cut-and-lift
REMV EXIST STR band$40k – $125k
C204877 · CONSTRAINT CALENDARLIVE
PLANS POST
LETTING 08-18
BID TAB → SCORE
BAT MORATORIUM
DEMO SEASON

Jul 2026 ──────────────────────── Apr 2027. The moratorium forces a winter execution window — priced into the band.

SPIN THE MODEL IN YOUR BROWSER ↗
CALIBRATION RECORDWE KEEP SCORE IN PUBLIC
Every band we publish gets scored against the bid tab when it posts. C204877's tabulation publishes ~September 2026 — the prediction above stands on the record either way. Ask anyone else selling estimates for their scorecard.

What it costs

Low four figures per contract, fixed fee. No subscription, no procurement friction. If it doesn't change how you carry the removal items — in price or in risk — don't buy the next one.

Live 3D demonstrationfree
Pre-bid prospectus, per contractfixed · low 4-figure
Removal-sequence simulation supportscoped per project
Method & value studiesscoped per project

Request a prospectus

Name a contract on your letting list — or ask for the Floyds Creek walk-through first.

REQUEST / PROSPECTUS INQUIRYRESPONSE ≤ 1 BUSINESS DAY